Cameron Lake Gold Belt · Northern Ontario · CSE: BG
418 claims, 10,000+ hectares in the Cameron Lake Gold Belt — approximately 5 km west of Seva Mining’s Cameron Gold Project. High-grade surface results and a completed VTEM airborne survey.
Exploration Highlights
Highest-grade grab sample recovered from the Pit 1 zone during systematic prospecting. A second grab from the same zone returned 8.04 g/t Au. Grab samples are selective by nature and not representative of average grades.
Confirms consistent high-grade surface expression at the Pit 1 zone. Both results are from the same structural corridor and are associated with quartz-sulphide veining in sheared metavolcanic host rocks.
Versatile Time-domain Electromagnetic (VTEM) and magnetic survey completed over the full project area in 2021. Survey defined a series of EM conductors and magnetic anomalies that remain untested by drilling.
One of the largest single-company land positions in the Cameron Lake Gold Belt. The project covers multiple untested EM conductor trends defined by the 2021 VTEM survey over a 40+ km strike length.
Seva Mining Corp. (formerly Cameron Gold, acquired from First Mining Gold) operates immediately to the east. The Cameron Gold Project has a defined resource and validates the belt-scale gold endowment.
Priority targets were defined from integration of VTEM conductors, surface geochemistry, and structural mapping. The project is permitted and ready for a maiden drill program at the highest-priority target.
Project Location

The Cameron Lake Gold Belt is an Archean greenstone sequence within the Quetico Subprovince of the Superior Province. The project lies along the same regional gold trend as Seva Mining’s Cameron Gold Project. Road-accessible year-round via the Trans-Canada corridor.
FIELD PHOTOGRAPHY











Geology
The Martin Kenty Gold Project is hosted in Archean metavolcanic and metasedimentary rocks of the Cameron Lake Gold Belt, within the Quetico Subprovince of the Superior Province. Gold mineralization at the Pit 1 zone is associated with quartz-sulphide veining in sheared mafic metavolcanics, interpreted to be controlled by a regional ENE-trending structure.
The 2021 VTEM airborne survey identified multiple EM conductor and magnetic anomaly trends across the project area. These geophysical targets, combined with the known surface gold occurrences, define a district-scale exploration opportunity.
Next Steps
The priority work program at Martin Kenty focuses on advancing the highest-ranked VTEM targets through systematic ground follow-up. The Pit 1 zone — with its confirmed high-grade surface expression — is the lead drill target. Work is contingent on permitting timelines and capital allocation relative to Tabor.
Technical Disclosure — Cautionary Notes
Qualified Person. The scientific and technical information on this page has been reviewed and approved by Morgan Verge, P.Geo., a Qualified Person as defined by National Instrument 43-101 — Standards of Disclosure for Mineral Projects.
Grab samples. Grab samples are selective by nature and may not be representative of average mineralization on the property. The 8.37 g/t and 8.04 g/t Au results are not indicative of average grades across the project area.
Proximity disclosure. The reference to Seva Mining Corp.’s Cameron Gold Project is for geographic context only. Mineralization on adjacent properties is not necessarily indicative of mineralization on the Martin Kenty property.
Forward-looking statements. References to planned exploration, anticipated drill programs, and future activities constitute forward-looking statements. Actual results may differ materially.